NEBS vs. the Hottest Place on Earth

As mentioned in Higher Temperatures for Data Center and Processors for Higher Temps, various groups are pushing for higher and higher ambient temperatures in data centers. At Google's Efficient Data Center Summit last week, Amazon's James Hamilton brought up an interesting point in his slides and blog about ambient temperatures:
the hottest place on earth over recorded history was Al Aziziyah Libya in 1922 where 136F (58C) was indicated

James went on to note during his talk that telecommunications equipment designed to the NEBS (Network Equipment Building System) standards routinely has to handle temperatures up to 40°C.

Actually, the story is better than that. NEBS-GR-63 (the key NEBS specification dealing with environmental conditions for equipment in telecommunications central offices) requires equipment to handle 40°C long-term ambient temperatures, but telecommunications equipment certified at the shelf (chassis) level needs to be able to operate at 55°C ambient for up to 96 hours at a time and up to 360 hours per year [the 360 hours is for reliability calculations]. This means that much of the NEBS-rated equipment for data centers can operate at temperatures that are only 3°C lower than the highest natural temperature ever recorded on Earth, as noted by James.

Given the common engineering penchant to provide some guardband on products vs. the official specifications, even a 58°C ambient is not out of the question. This means that NEBS-rated equipment could be good candidates for data centers operating at high temperatures.

But can you get decent performance in NEBS-rated servers? Yes! For example, vendors such as Radisys, Kontron, and Emerson have announced blade servers with Intel's new 5500 (aka "Nehalem") processors, and their bladed servers commonly are NEBS certified to operate at 55°C. This would allow the latest server technology to operate in the most demanding environments.

--kb

Tuesday, February 17, 2009

Server Cost Adders for Higher-temp Operation

Numerous industry notables, including Microsoft's Christian Belady, have been advocating the operation of data centers with higher ambient temperatures. The cost savings by reducing or eliminating cooling plant costs could yield considerable savings. But what does it take to build servers designed to operate at these higher temperatures?

As mentioned in a previous post, telecommunications equipment is typically designed to meet the NEBS standards (55°C maximum ambient). Cost adders for NEBS equipment include the following:
  • Higher temperature integrated circuits (ICs). Commercial-grade ICs are generally rated to 70°C; higher ambient temperatures could force the use of extended temp components.
  • Heat sink costs. Higher temperatures often drive more expensive heat sink materials (i.e., copper rather than aluminum) and more use of heat sinks on components that don't need them at lower temperatures. For example, some servers need heat spreaders on DIMMs to be rated to operate at higher temperatures.
  • Corrosive gases tolerance. Telecommunications equipment generally needs to pass tests to ensure reliability in the presence of corrosive gases, including high sulfur-content air. Before dismissing this requirement, consider the case of air-side economizers: if you're bringing in outside air, do you need to worry about contaminants in the air, such as diesel exhaust from nearby trucks or from diesel generators?
  • Wider humidity range. Most NEBS equipment is designed for a wider range of allowable humidity exposure than most data center equipment. The broader use of economizers might make a wider humidity range desirable for data centers.
  • Flame tests. NEBS flame tests may be overkill for most data center equipment, in part because most data centers have sprinklers or other fire suppression controls (unlike telecom central offices, which do not have sprinklers).
  • Shake and vibe tests. NEBS equipment generally is tested to meet seismic Zone 4 earthquake tests. These tests could just as well apply to data center equipment, but it is something beyond what most data center equipment is validated against.
  • Materials selection. The use of V0-rated plastics and HF-1 or better foams in data center equipment is not necessarily a cost adder if designed in up front, but it can add appreciable expense if retrofits have to be made after-the-fact.
  • Air filters. Data center equipment generally doesn't need air filters, so these can be eliminated.
  • Long life. This actually encompasses two aspects: extended availability of certain components and long-life reliability. Telecom products often require the availability of the same components for 5-7 years, much longer than typical data center products. Similarly, telecom products often are designed to meet usable lifetimes that are much longer than most data center refresh cycles.

Which of these attributes are needed for equipment in data centers with higher temperatures? What other attributes are needed for higher temps?

--kb

Friday, February 13, 2009

Processors for Higher Temps

Higher Temperatures for Data Centers talks about emerging environmental standards that could well lead to increasing ambient temperatures in facilities. All other things being equal, higher ambient temperatures will lead to higher component temperatures.

In many cases, the maximum processor case temperature (Tcase) is the limiting factor for how high the ambient temperature can be raised. The Tcase limit is established by the semiconductor vendor as the maximum case temperature that the chip can experience and still meet the vendor's reliability goals.

This can put a crimp in plans to use outside air for cooling. In most likely data center locations, there are occasionally warm days that would increase the inlet temperature to the servers to the point that the processor Tcase would exceed the vendor's specified ratings.

The telecommunications market has had this issue for years.
NEBS-rated equipment for central offices generally has to operate at 40°C ambient temperature, but they also need to operate at 55°C for short periods (up to 96 hours at a time and up to 360 hours per year).

To address the needs of the NEBS market, Intel provides some of their processors with
dual Tcase ratings: one long-term T-case rating and a second short-term Tcase rating that is 15°C higher for up to 360 hours per year.

These processors with dual Tcase ratings may be a good fit for systems in data centers that use air-side economizers.

Wednesday, February 11, 2009

Higher Temperatures for Data Centers

As mentioned in Using Outside Air for Data Centers, there is increasing interest in using outside air to cool data centers. At times, this will mean higher ambient temperatures inside those data centers.

A couple years ago, the TEM-led SCOPE Alliance undertook the task of identifying the relevant environmental requirements for data centers and telecommunications from several different standards groups (Telcordia, ETSI, TIA, etc.) and came up with the Environmental Profile: Central Offices and Network Data Centers, eventually published last May. It was a lot of work, but I think we developed the most comprehensive overlay of those standards that has been published to date.

Last August, ASHRAE issued its 2008 ASHRAE Environmental Guidelines for Datacom Equipment, which changed the recommended setpoints in data centers from 20-25°C to 18-27°C. This may not seem like much, but it's a step in the right direction towards better allowances for dry-side (air) economizers.

Last November, Telcordia released GR-3160, NEBS(TM) Requirements for Telecommunications Data CenterEquipment and Spaces. [I had provided information for this to Telcordia through the two years this document was in process.] Though those outside the telecom world may not be familiar with Telcordia (or its predecessor, Bellcore), the Telcordia NEBS standards have become the de facto standards for how telecommunications facilties and equipment is designed in the U.S. and many places around the world. GR-3160 is effectively Telcordia's first major foray into data center standards, a clear recognition that telecommunications carriers like AT&T, Verizon, and Qwest have a large number of data centers and a growing need to ensure maximum availability in those facilities. Among the interesting elements of GR-3160 is Telcordia's expectation for allowable maximum ambient temperatures at the air inlet to the rack-mounted equipment:
  • 30°C long-term max ambient
  • 40°C short-term max ambient (up to 360 hours per year)

These two upper limits provide a reasonable target that equipment manufacturers can design to, while providing enough freedom that facility designers can make maximum use of economizers.